Forecasting & Supply Planning
12-month Open-to-Buy & PO release calendar, new-product launches, multi-level BOM & raw-material MRP, multi-echelon supply networks, and verified head-to-head forecast benchmarks.
Sign in required
Sign in with a workspace owner, buyer, or finance account to open Forecasting & Supply Planning.
12-Month Rolling Demand, Open-to-Buy & Purchase Calendar
Project 365-day seasonal demand into 12 monthly buckets, apply top-down revenue targets or audited SKU unit overrides, and generate supplier PO release dates.
Configure plan targets, monthly budget caps & SKU unit overrides
Workspace 12-Month OTB & Cash Budget Ledger
Open-to-Buy (OTB) = Target EOM Inventory + Planned Sales − Beginning Inventory − Committed On-Order.
| Month | Beg. Inv | On-Order | Baseline | Planned Sales | OTB Units | OTB Retail | OTB COGS | Planned PO | PO Spend & Cap | End Inv | Rev Gap |
|---|
12-Month Supplier PO Release Calendar
Release dates offset backward from each month's needed receipt date by effective supplier or network lead time.
| Release Date | Supplier | For Month | Lines | Total Units | Est. Spend | Urgency | Action |
|---|
Annual SKU Summary
12-month rollups with forecast regime, lead time, P90 safety stock, and OTB units.
| SKU | Supplier | Regime | Open Stock | Safety | 12m Sales | 12m OTB | 12m PO Spend |
|---|
New-Product Launch Planning & Post-Launch Velocity Tracker
Plan draft or newly stocked SKU launches from 1–5 comparable SKUs (or workspace priors), split initial buys across child variants (10,000 bps), and track Bayesian post-launch velocity.
Multi-Level BOM, Assembly Schedule & Raw-Material MRP
Explode forecasted finished-goods and launch demand through Production BOMs and Warehouse Bundles (up to 3 levels with cycle checks and scrap factors) into dated assembly runs and pegged raw-material POs.
Proposed Assembly & Production Schedule
Batch-rounded build orders offset backward by assembly lead days.
| Start Date | Due Date | Parent SKU | Location | Lvl | Net Need | Build Qty | Status |
|---|
Pegged Raw-Material & Component Requirements
Shared components aggregated across all parent kits, netted against on-hand & open POs.
| Component SKU | Pegged Parents | Gross Req | Usable / POs | Net Short | Rec. PO | Release By |
|---|
Multi-Stage Supply Network Replenishment
Coordinate Supplier → Upstream Hub → Production Stage → Spoke Locations using empirical receipt lead-time variability and compound uncertainty safety stock.
Coordinated Hub Echelon Recommendations
System-wide echelon inventory position across upstream hubs and connected spoke stores.
| SKU | Hub Location | Spokes | Cumulative Lead | Echelon SS | Echelon Pos / ROP | Spoke Transfers | Consolidated Hub PO |
|---|
Lane Lead-Time Breakdown & Spoke Actions
Combines empirical supplier receipt lead time (μs ± σs), production (μp), and transfer (μt) into compound safety stock.
| SKU | Route | Supplier (μ ± σ) | Prod / Trans | Total Network Lead | Compound SS90 | Coordinated Action |
|---|
Model Leaderboard (SupplyGain vs. 5 Baselines)
Evaluated strictly on uncensored post-cutoff observations with zero future leakage.
| Model | Windows | WAPE (%) | Daily WAPE | MASE | Signed Bias | P90 Pinball | P90 Cov (%) | Sim. Fill Rate | Sim. Avg Stock |
|---|
Head-to-Head Forecast Accuracy & Prospective Trial Ledger
Zero-lookahead walk-forward backtesting of SupplyGain Forecaster against 5 transparent baselines, plus SHA-256 tamper-evident prospective merchant trial snapshots.
Prospective Trial Snapshots (Tamper-Evident Ledger)
Score frozen pre-window predictions against subsequent actual sales.
| ID | Label | Window | SHA-256 Prefix | Action |
|---|
Per-SKU Accuracy vs. 30d Velocity
Head-to-head SKU breakdown across evaluated origins.
| SKU | Regime | SG WAPE | 30d Vel WAPE | 28d Raw MA | Gain vs Vel |
|---|